BY PUBLIC RELATIONS | SEP 7, 2021 | TOP STORIES
The Barbados Tourism Investment Inc. (BTI) wishes to remind the public of the continuation of the Salt Pond Flood Mitigation Project.
The project, now in its 2nd Phase will require the closure of the bridge on the KNR Highway in Speightstown.
These changes are scheduled from Monday, 20th September, 2021 until Monday, 24th January, 2022 should weather permit and not cause disruptions to workflow.
As a result of these works, there may be extended transit times for motorists using this route. Where possible, alternative routes should be utilized to avoid congestion.
The BTI thanks the public for their co-operation and apologizes for any inconvenienced caused during the scheduled works.